


Corstorphine + Wright was appointed with Mace to review the existing Humanities Building at Warwick University.
The strategy was to consider if the building, constructed in the 1970s, could be made energy efficient, helping to reduce the carbon footprint of the campus.
The proposals ranged from refurbishment to the replacement of the building with each option being costed and reviewed from a carbon reduction perspective.
Toggle