Corstorphine + Wright was successful in winning the bid with construction company Morgan Ashurst by demonstrating an ability to consider the existing facilities, work to a carefully targeted programme and deliver the buildings in accordance with the college’s objectives and term times.

Demolition and migration of existing facilities took place to make the area available for new buildings with subsequent construction taking place within the existing and operational campus, requiring particularly careful and considered planning.

The team worked in close liaison with client and college representatives to ensure that existing construction students could use the live site as part of their studies.

The client felt that our response addressed the aspirations the College had for the site and was commercially viable, whilst also taking into consideration the health and safety issues connected with existing students being based on site during the works.

  •  
  •  
  •  
  •