The Oaks Coventry, UK

Client

McLaren Property

Location

Coventry

Student Beds

2226

The Oaks has been developed over several phases for McLaren Property and has become a thriving student living campus on the doorstep of the internationally regarded Warwick University.

The location adjacent to an ancient woodland provides a unique, peaceful setting, with a focus on student wellbeing and reducing environmental impact. The campus is characterised by carefully placed buildings amongst established trees, seeking to preserve the natural character of the area.

Initially transforming a vacant office site into purpose-built student accommodation, the development has progressively expanded to meet growing demand for high-quality student living, breathing new life into the local area and stimulating similar redevelopment within Westwood Way.

Phase 1 established the foundations of the development, delivering 378 student bedrooms alongside a comprehensive range of amenity spaces. A key milestone, the carefully considered scale and natural material palette demonstrated that new development could enhance the setting and that the introduction of a student community would bring much needed regeneration.

 

The Oaks_Overview_1340_01

Building on its success, Phases 2 & 3 introduced a further 639 student residences, establishing a cohesive student village.

Phases 4 & 5 represent the final stages of development, with the introduction of mixed uses; 1,078 student residences, 131 co-living units and 7,000 sq ft of retail space. Along with a variety of uses, this final phase seeks to integrate with the existing Westwood Way community by providing public realm space at the heart of the development.

Across all five phases, totalling more than 2,200 residences, the development places an emphasis on high-quality architecture, generous amenity provision and integration with the surrounding landscape. Together, the proposals establish a vibrant, sustainable and well-connected community, supporting the University, contributing to the local economy and transforming a significant area into a thriving destination for students, residents and visitors.

The Oaks_Phase_2&3_Header_01

Phase 1

The first phase established The Oaks as a high-quality, purpose-built student residential development, delivering 378 bedrooms on the site of a previously vacant office building.

Responding to increasing demand for student accommodation driven by the growth of both Coventry and Warwick Universities, the development contributes to the retail and leisure economy of the immediate locality.

_U4A9050-min
_U4A9498-HDR-min
C+W_TheOaksPhase1_039

The seven-storey building offers a variety of premium self-contained studio apartments and en-suite cluster suites, supported by an extensive range of student amenities.

These include a gym, rooftop garden terrace, games room, cinema room, three dedicated quiet study rooms, group study areas, individual study pods and bookable kitchen and dining facilities for student celebrations and events. The facilities cater for a diverse range of lifestyles, from those who wish to socialise, benefiting from the sense of community, and those that wish to study quietly or take time out from a busy academic life.

 

WEBSITE_U4A9558 _U4A9490-HDR-min

Externally, landscaped green spaces provide opportunities for outdoor recreation and opportunity to appreciate the natural setting.

C+W_TheOaksPhase1_035

Secure cycle storage and onsite laundry facilities further contribute to a comprehensive offer, providing students with everything they need throughout their studies, in a natural setting to promote health and wellbeing.

C+W_TheOaksPhase1_043
C+W_TheOaksPhase1_051
_U4A8864_V2-min

Phase 2 & 3

Building on the success of Phase 1, Corstorphine & Wright were appointed by McLaren Property to develop a larger adjacent site, delivering a further 639 student residences resulting in a cohesive student village. The development also incorporates accommodation for the neighbouring National Mathematics and Science College (NMSC), with appropriate security given to the younger 16-18 age group.

The four to six-storey buildings are strategically positioned between established tree lines to the east and west, making the most of the site’s natural asset. Arranged around three private landscaped courtyards, the development provides secure external spaces for residents, connected to ground-floor amenity areas incorporating social and collaborative learning spaces, gym and wellness facilities, and private dining.

The Oaks_Phase_2&3_1340_03
The Oaks_Phase_2&3_1604_04
The Oaks_Phase_2&3_1604_05

A restrained palette of high-quality materials creates a consistent architectural language across the buildings, providing continuity with Phase 1 and an enduring design identity.

The Oaks_Phase_2&3_1604_15
The Oaks_Phase_2&3_1604_16

The resulting student village provides an engaging and sustainable living environment,

with a strong relationship between the built form, landscaped surroundings and shared amenity spaces, supporting students throughout their academic careers.

The Oaks_Phase_2&3_1340_14
Longwood_place_03_Full Width

Phases 4 & 5

The final phases represented a step change in the scale and diversity of accommodation on offer as part of the Oaks Campus. With a significant increase in site area compared to previous phases, McLaren Property sought to provide a truly mixed use development capable of integrating the Student community into the wider social and economic context. Retail and Co-living uses are included, alongside an innovative move to include public realm at the heart of the scheme.

The development provides 1,078 purpose-built student accommodation units, 131 co-living units and 7,040 sq ft of retail space.

 

Longwood_place_13_1340 Longwood_place_02_1340

Active ground-floor frontages and generous glazed shopfronts announce the development to Westwood Way, with a new public square that creates a vibrant focal point for the wider business park.

Longwood_place_10_Full Width

The student accommodation is arranged using modular residential floor layouts,

allowing a variety of room types and configurations while maintaining the proportions and architectural consistency of the building massing and facades. Extensive resident amenity spaces are provided at ground-floor level across Blocks A to E, with Block A forming the heart of the community through its main entrance and central social spaces. Views out to the enhanced landscape, with direct connection to the public realm promote a sense of openness and connection to the wider student community.

Longwood_place_18_1340

The development places a strong emphasis on high-quality design, materiality and sustainability, with a BREEAM Excellent rating and the incorporation of sustainable design approaches and technologies. Secure-by-design principles, a considered management strategy and generous public and private external amenity spaces further support the student experience.

Longwood_place_12_1604 X 1280webp
Longwood_place_11_1604 X 1280

By redeveloping an inactive commercial site, the completed development has reinvigorated Westwood Way, bringing the vitality of student life whilst providing a significant socioeconomic boost. It has also created employment opportunities throughout construction and within the completed scheme, establishing a vibrant mixed-use destination that responds to the needs of the expanding Warwick University Campus.

Longwood_place_17_Header

People behind the project

Every project starts with a conversation.
Let’s discuss your opportunities, constraints and questions.

Contact Us
  • RIBA-Chartered-Practice BLK
  • CIAT-Chartered-Practice-BLK
  • AJ-Top100-Stacked
  • UDG-Registered-Practice-CW-Web-BLK
  • ukgbc-standard-member-BLK
  • constructionline-logo-grey-BLK
  • ICSC-logo-2021-grey-BLK
  • BCO_Logo_GreyMono_350px-BLK
  • RISQS-logo-2021-grey-BLK
  • New_PHT_Member_BLK
  • BSFSignatory-A-BLK
  • SCF-Partner-CW-BLK
  • ISO9001-A-BLK
  • ISO14001-A-BLK

Did you mean?

Sorry, we couldn't find any results matching your search term.
Please try searching for something else.

Our Latest News and Insights

View All Latest News

Projects

10 results

View All Projects

Our People

10 results

Meet Our Team

Our People

Meet Our Team

News and Insights

3 results

Our Studios

View All Our Studios